. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. Have a look here http://www.technobots.co.uk/acatalog..._Cams_404.html for your pulleys and belts, this is where u got mine from, if you cant see what your after give them a ring, thats what i did. They are very helpfull!

  2. #2
    Quote Originally Posted by AdCNC View Post
    Have a look here http://www.technobots.co.uk/acatalog..._Cams_404.html for your pulleys and belts, this is where u got mine from,
    +1 on helpful!
    AdCNC - Now that your machine has been running a while ... i appreciate its servos not steppers ... but any comments / after thoughts on belt size/pitch/width/type, gear size/material, ratios or the design you used to allow for tension adjust?

    If you remember .. what were the specs of the belt + pulleys you used?

    BIG THANK YOU!
    *looking 90% like it will be SY60 steppers (48v BiPol Parrell) for 2x Xaxis ballscrews 1100mm long each hauling 35kg of Y + Z + router

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Calculating timing belt lengths
    By Jonathan in forum Gantry/Router Machines & Building
    Replies: 11
    Last Post: 10-12-2015, 11:32 AM
  2. Timing Pulley/Belt sizing software
    By m_c in forum Computer Software
    Replies: 4
    Last Post: 12-04-2014, 03:33 PM
  3. timing belt instead of lead screw
    By deannos in forum Gantry/Router Machines & Building
    Replies: 28
    Last Post: 06-03-2012, 08:25 AM
  4. Timing belt drive concept, would this work?
    By psiron in forum Belt Drive, Pulleys & Timing
    Replies: 8
    Last Post: 16-06-2010, 03:31 PM
  5. Timing belt instead of rack!
    By ptjw7uk in forum Belt Drive, Pulleys & Timing
    Replies: 8
    Last Post: 18-12-2009, 12:49 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •