they way to check is:

put your meter on continuity and the neg lead on the c connection and the pos on the nc and the buzzer should sound. Then get mach to switch the spindle on and the connection will be broke and the buzzer will go off. With the spindle off move the pos lead to the no connection and the buzzer will be off, then activate the spindle and the buzzer should sound.