Thread: At Long Last!!
Threaded View
-
10-08-2010 #1
Well here goes folks.
Today I started the build ... Well I had to clear some space first.
Laid out the Ali extrusion I have cut and had the ends milled square (thanks Paul, more heading your way shortly).
Extrusion is Bosch Rexroth 45 X 45
Y Axis Frame Drilled and bolted + 90 deg Brackets
Y Axis Frame legs added (Levelling feet and outriggers/stabilisers still to be fitted)
Z Axis Frame Drilled Milled and Bolted.
Z Axis mounted, (Bracing still to be fitted)
2 X IGUS N-27 Linear Rails (500mm) with 4 X N-4-27 Carriages attached to 500mm length of T nut Drilled and Tapped (Yep you guessed it ... Paul ... again)
Rails attached to Y Axis
More IGUS Kit on order but Holidays coming up this weekend, so that's it for a while.Tim G-C
“I disapprove of what you say, but I will defend to the death your right to say it.”
(attrib. Voltaire but written by Evelyn Beatrice Hall "The Friends of Voltaire" 1906)
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
How long
By Jester in forum General DiscussionReplies: 1Last Post: 04-01-2014, 03:16 PM -
Long Down Cut Spiral End Mills
By Bazzer in forum Marketplace DiscussionReplies: 2Last Post: 23-12-2013, 06:11 PM -
RFQ: 16mm long stainless pins with m5 tap
By dazza in forum Projects, Jobs & RequestsReplies: 12Last Post: 11-03-2013, 03:12 PM -
NEW MEMBER: Hi from long time loiterer
By r0bsk1 in forum New Member IntroductionsReplies: 0Last Post: 11-07-2012, 11:10 PM -
NEW MEMBER: Greetings, Long Beach Ca.
By Mr Bonavita in forum New Member IntroductionsReplies: 1Last Post: 10-09-2010, 01:26 PM
Bookmarks