. .
Page 32 of 63 FirstFirst ... 22303132333442 ... LastLast

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Second rail is squared up and drilled, tapped and bolted down. I can't notice any tight spits but as Jonathan said you've got to really get them out of line to notice any tight spots.

    Tapped the holes on the top of the gantry and used the straight edge and DTI to get it as near straight as possible.



    Just going to do the same for the bottom rail....

    Edit: The DTI is running along the front if the aluminum plate not the rail itself...

    Painting the frame tomorrow...
    Last edited by njhussey; 13-02-2015 at 09:00 AM.
    Neil...

    Build log...here

  2. #2
    In the video is your indicator tip running along the other rail - not the rail you're pushing the bearing along? It's hard to see in the video... you will want to indicate from one rail to the other to get them parallel (ish).

    Edit: Just realised, looks like you're indicating against the straight edge?
    Last edited by Jonathan; 12-02-2015 at 10:51 PM.
    Old router build log here. New router build log here. Lathe build log here.
    Electric motorbike project here.

  3. #3
    Yes indicating along the front of the top piece of Ali. Checked it with a straight edge, feeler and light first. Will indicate off the second rail once the gantry is together.

    The Ali top, bottom and front pieces were CNC machined to size in one go (I sent them out to someone with a bigger table than me....cheating I know but more accurate than making a jig and moving the plate along to machine a bit at a time ) and clamped together (not the front plate) so I'm hoping that once it's put together it won't need too much tweaking to get them parallel (ish)
    Last edited by njhussey; 13-02-2015 at 12:19 PM.
    Neil...

    Build log...here

  4. #4
    Did a bit of painting this afternoon for an hour....

    Click image for larger version. 

Name:	Paint_1.jpg 
Views:	318 
Size:	358.7 KB 
ID:	14664
    Neil...

    Build log...here

  5. #5
    More machining today, got a couple of new M4 spiral flute taps which make light work of the tapping for the 15mm THK rails on the front plate.

    Neil...

    Build log...here

  6. #6
    Set the Z axis rails parallel by referencing off the plate side for the master rail then referencing the secondary rail off the master...

    Neil...

    Build log...here

  7. #7
    Flying along now and looking good.
    Spelling mistakes are not intentional, I only seem to see them some time after I've posted

  8. #8
    Quote Originally Posted by EddyCurrent View Post
    Flying along now and looking good.
    Cheers...going to order a couple of CSIMO IP-M's and some Nema 34 4&8Nm steppers, 240v N series drivers today for the mill conversion (that's next to do) one's for the X axis on this...
    Neil...

    Build log...here

  9. #9
    Had to "tweak" some machining on the Z axis stepper mount and also the Z axis back plate...will also have to machine a small pocket out of the Z axis front plate for the ballnut mount as it's not quite (0.6mm) right...





    It's going together quite nicely...so far!

    Last edited by njhussey; 18-02-2015 at 04:28 PM.
    Neil...

    Build log...here

  10. #10
    OK so Z axis is together now, couldn't resist a little test with a cordless drill The machining on the ballscrew is not 100%, there's a wobble on the drill but it's not too bad and I'll be able to live with it.



    For the eagle eyed among you you'll notice that there are 8 holes for the ballnut holder....erm not much to say apart from oops
    Last edited by njhussey; 18-02-2015 at 05:40 PM.
    Neil...

    Build log...here

Page 32 of 63 FirstFirst ... 22303132333442 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 10 users browsing this thread. (0 members and 10 guests)

Similar Threads

  1. Does anyone want to build me a cnc router?
    By totally useless in forum Open Source Designs & Plans
    Replies: 25
    Last Post: 05-05-2014, 12:44 AM
  2. My new, and first build....comments greatfully received
    By berk in forum Gantry/Router Machines & Building
    Replies: 7
    Last Post: 12-01-2014, 03:15 PM
  3. BUILD LOG: CNC Router New Build
    By PilotTom in forum DIY Router Build Logs
    Replies: 12
    Last Post: 25-05-2013, 03:49 PM
  4. BUILD LOG: A3 Router Build
    By GTJim in forum DIY Router Build Logs
    Replies: 6
    Last Post: 17-02-2012, 12:53 PM
  5. CNC construction TUNISIA give your comments
    By ali hedi in forum Gantry/Router Machines & Building
    Replies: 5
    Last Post: 06-07-2011, 11:58 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •