Dean, the plan is to put a second floor of 18mm ply screwed to it and then bolt the machine through the floor and into the base which has 12 4" x 4" posts concreted into the ground. I'll insulate the walls with Celotex and skin it with 12mm ply. This will be screwed to the walls and braced round the top and bottom. Its only a temporary shed/workshop until we move so hopefully it won't shake itself to bits before then!!