Threaded View
-
16-01-2014 #10
Well after another couple of months of inactivity I finished welding up the basic frame. I've still got to attach the side rails (and ends) but am unsure whether to bolt them (so I can adjust them so they're level) and then weld them or just weld them as near as possible as I'm going to do the epoxy levelling on them. I presume that It's doubtful that they'll be level enough to mount the linear rails directly on them without some form of levelling? I've no straight edge to measure them with mind...
Attachment shows the frame tacked up previously not welded up before the eagle eyed point this out...!Last edited by njhussey; 16-01-2014 at 03:08 PM.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Does anyone want to build me a cnc router?
By totally useless in forum Open Source Designs & PlansReplies: 25Last Post: 05-05-2014, 12:44 AM -
My new, and first build....comments greatfully received
By berk in forum Gantry/Router Machines & BuildingReplies: 7Last Post: 12-01-2014, 03:15 PM -
BUILD LOG: CNC Router New Build
By PilotTom in forum DIY Router Build LogsReplies: 12Last Post: 25-05-2013, 03:49 PM -
BUILD LOG: A3 Router Build
By GTJim in forum DIY Router Build LogsReplies: 6Last Post: 17-02-2012, 12:53 PM -
CNC construction TUNISIA give your comments
By ali hedi in forum Gantry/Router Machines & BuildingReplies: 5Last Post: 06-07-2011, 11:58 PM
Bookmarks