Today I was checking the wiring and powering up the relay to make sure that it bought the power on and that the door safety switch worked etc. and on measuring the voltage found that our single phase power supply is 242V which I think will mean that my PSU (25V+25V) will be putting out too high a voltage, or at least be too near the 80V limit of the AM882s for comfort....will dig out my calculations and have a look tomorrow :(