Unfortunately I didn't get any time on the build over the Christmas period as I was away, only had 1 night at home and that was only really a pit stop to dump presents and pick up more on the way to the next relative.

Planning on getting another length of Ali on Friday and re-doing the skate bearing pieces. Will probably take it into work Sat AM and use the metal saw there to get them exactly the same length. Hopefully I'll not have brain fade this time so the holes will line up correctly!

The top picture in the above post of mine shows one side which in the photo looks OK.....however in my rush to get something done I assembled and drilled it back to front and the bearing holders were upside down, about as wrong as you can get!! Less haste, more speed comes to mind!! The top one should be the fixed with the bottom one able to be clamped up to the pipe to eliminate play.

Should have some updates on the weekend for you, hoping to get quite alot done as no plans for the weekend :)