Cheers guys!

Once my Mum's (now half mine) house sells (exchanging contracts in a week or so) then I need to buy a 9' x 6' shed which will take 2 weeks to be delivered so the SBR20 rails and RM1610 and 1605 ball screws and BK/BF ends and NEMA 23 motors and drivers will all be ordered at the same time so they should all arrive at about the same time.

A couple of clearer jpgs below...

Click image for larger version. 

Name:	NJH Rev4 CNC Router_3.jpg 
Views:	1020 
Size:	283.9 KB 
ID:	9150Click image for larger version. 

Name:	NJH Rev4 CNC Router_2.jpg 
Views:	653 
Size:	157.4 KB 
ID:	9149Click image for larger version. 

Name:	NJH Rev4 CNC Router_1.jpg 
Views:	660 
Size:	250.0 KB 
ID:	9148