Hybrid View
-
12-02-2014 #1
Today's small advancement....wish I could have a few hours uninterrupted in the workshop to crack on! Anyway I only managed to mark out (wrongly ...what is it, measure twice, cut/drill once??!!) the holes for the bottom section of the gantry and drill them and put the carriage mount pieces on the carriages. Marked out one carriage mount but ran out of time to centre punch and drill.
.
Last edited by njhussey; 12-02-2014 at 03:04 PM.
-
12-02-2014 #2
Looking good Neil. You just have to keep chipping away at it.
In post #224 and #221 the Y ballscrew looks like it is some way off the Y axis, dropped down on some spacers. Would it instead fit under the Z stepper motor and attach directly to the trapezoidal shaped plate on the side of the Y axis (i.e. ballscrew on top of the gantry)?
-
13-02-2014 #3
Thank you, that's what I am doing, it's just frustrating!
In post #224 and #221 the Y ballscrew looks like it is some way off the Y axis, dropped down on some spacers. Would it instead fit under the Z stepper motor and attach directly to the trapezoidal shaped plate on the side of the Y axis (i.e. ballscrew on top of the gantry)?
This shows the Y axis ball nut holder attaching to the Z axis plate.
Thread Information
Users Browsing this Thread
There are currently 15 users browsing this thread. (0 members and 15 guests)
Similar Threads
-
Does anyone want to build me a cnc router?
By totally useless in forum Open Source Designs & PlansReplies: 25Last Post: 05-05-2014, 12:44 AM -
My new, and first build....comments greatfully received
By berk in forum Gantry/Router Machines & BuildingReplies: 7Last Post: 12-01-2014, 03:15 PM -
BUILD LOG: CNC Router New Build
By PilotTom in forum DIY Router Build LogsReplies: 12Last Post: 25-05-2013, 03:49 PM -
BUILD LOG: A3 Router Build
By GTJim in forum DIY Router Build LogsReplies: 6Last Post: 17-02-2012, 12:53 PM -
CNC construction TUNISIA give your comments
By ali hedi in forum Gantry/Router Machines & BuildingReplies: 5Last Post: 06-07-2011, 11:58 PM
Bookmarks