. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Used the Router for the first time since going vertical and it's soooooooooo much easier ....no bending over the sides (kneeling for me as I had it on the floor!) to load the work. Just need to make a dust shoe ASAP and cyclone to stop the chips from flying everywhere....it fair flings the plastic chips (and the static little buggers cling to everywhere!!!) around
    Neil...

    Build log...here

  2. #2
    And the all important vid is!!!
    ..Clive
    The more you know, The better you know, How little you know

  3. #3
    Just watch your head.!! . . . . Got nasty habbit of twating you if not careful.!! . .

  4. #4
    Quote Originally Posted by JAZZCNC View Post
    Just watch your head.!! . . . . Got nasty habbit of twating you if not careful.!! . .
    Got a lump forming as we speak on the back of my head already.....
    Neil...

    Build log...here

  5. #5
    Looking great Neil. At one point it looked lie you'd created a plastic fountain :-). Hope your head gets better soon.

  6. #6
    Quote Originally Posted by njhussey View Post
    Got a lump forming as we speak on the back of my head already.....
    How about a sensor on your head connected to the osh22t button Nice to see it in action though.
    ..Clive
    The more you know, The better you know, How little you know

  7. #7
    Quote Originally Posted by Clive S View Post
    How about a sensor on your head connected to the osh22t button Nice to see it in action though.
    No because as soon as the oshiiiiiiiiiiiit button is pressed the gantry drops....... However........I do have my foam kneeling pad which I don't use anymore now it's vertical....I could put a couple of cable ties through the handles to loop under my ears to keep it strapped over my head!!!!
    Neil...

    Build log...here

  8. #8
    Nice vid Neil - lovely chip stream towards the end there.

    BTW - would demi-jon bungs do for rubber stops or not man enough for the job - just a thought as the type for the airlock come pre-drilled iirc.

  9. #9
    Quote Originally Posted by Clive S View Post
    And the all important vid is!!!
    Your wish is my command.....
    Last edited by njhussey; 29-07-2016 at 03:41 PM.
    Neil...

    Build log...here

  10. The Following 2 Users Say Thank You to njhussey For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 13 users browsing this thread. (0 members and 13 guests)

Similar Threads

  1. Does anyone want to build me a cnc router?
    By totally useless in forum Open Source Designs & Plans
    Replies: 25
    Last Post: 05-05-2014, 12:44 AM
  2. My new, and first build....comments greatfully received
    By berk in forum Gantry/Router Machines & Building
    Replies: 7
    Last Post: 12-01-2014, 03:15 PM
  3. BUILD LOG: CNC Router New Build
    By PilotTom in forum DIY Router Build Logs
    Replies: 12
    Last Post: 25-05-2013, 03:49 PM
  4. BUILD LOG: A3 Router Build
    By GTJim in forum DIY Router Build Logs
    Replies: 6
    Last Post: 17-02-2012, 12:53 PM
  5. CNC construction TUNISIA give your comments
    By ali hedi in forum Gantry/Router Machines & Building
    Replies: 5
    Last Post: 06-07-2011, 11:58 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •