. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    I tried the new x axis nut out last night. Backlash was very similiar to the previous nut at about 0.0007" and did not reduce even if I cranked the nut up tight so I suspect that I need to look at the preload on the AC bearings or check for movement of the bearing in its housing.

    Rapids have gone up from about 30" min to 150" min (+ acceleration increase) without lost steps so nut drag is much reduced.

    I am happy with the solution. Now to make the y axis (Z does not have a fancy nut as gravity is working in the same direction ad the cutting force so eliminating lash naturaly)

  2. #2
    I have had a busy week as my second child was born on Friday! All is well and Lydia is starting to become a bit more aware of her surroundings. It does mean that I have some paternity leave and so in between changing nappies and winding I have had a bit of shed time.

    I have rebuilt the mill and painted it. Here are some pics of the z assembly showing rotating nut (not pressed in in the photos)








  3. #3
    Here is a picture of the newly painted mill part assembled
    Click image for larger version. 

Name:	001-2.jpg 
Views:	1177 
Size:	351.8 KB 
ID:	3938

    Jobs I am hoping to do in the next couple of weeks:

    tidy up wiring with conduit and built swarf protection for limit switches
    screw and way protection
    Modify spindle ratio
    guards and machine mounted E stop

  4. #4
    Hi Andrew,

    Looking good

    How long did it take to design and build the Z axis ?

    Phil

  5. #5
    Quote Originally Posted by M250cnc View Post
    Hi Andrew,

    Looking good

    How long did it take to design and build the Z axis ?

    Phil
    Cheers. Design was carried out during daydreaming on the train and manufacture two or three saturdays of pottering in the shed plus a bit on the computer to purchase belts and bearings etc.

  6. #6
    I had my spindle running at 3500rpm and it was seriously heating up. Tried all the usual things, preload lubricant etc but to no avail. Thread on it here:

    http://www.mycncuk.com/forums/showth...2074#post22074

    Long story short I have rebuilt the spindle with better bearings and different seal system.

    Rubber seal replaced with alu labyrinth (shaft clearance 0.0015")


    Click image for larger version. 

Name:	009-1.jpg 
Views:	943 
Size:	144.8 KB 
ID:	4060

    I have also made a perspex guard over the pulleys. It is smoked rather than black so you can see which pulley has the belt on

    Click image for larger version. 

Name:	005-2.jpg 
Views:	1025 
Size:	161.8 KB 
ID:	4061

    without guard

    Click image for larger version. 

Name:	007-1.jpg 
Views:	984 
Size:	201.0 KB 
ID:	4062

    I am running the bearings in and will post progress when I next get a chance

  7. #7
    I fancied a change of tack so I have started checking and improving the geometry of the axes.

    First check is the perpendicularity of the knee. This is the set up for the first method

    Click image for larger version. 

Name:	001-3.jpg 
Views:	964 
Size:	255.6 KB 
ID:	4129
    Click image for larger version. 

Name:	002-6.jpg 
Views:	889 
Size:	211.6 KB 
ID:	4130

    This was the second method which I was planning on checking the first method with, however the results of this method were not very consistent so I abandoned it.

    Click image for larger version. 

Name:	003-4.jpg 
Views:	968 
Size:	266.3 KB 
ID:	4131

    The results show an error of about 0.001" out of plane using the first method which can be improved with a bit of judicious scraping.

    Click image for larger version. 

Name:	004-3.jpg 
Views:	957 
Size:	183.8 KB 
ID:	4132

    I has previously used the gound side surface of a parallel as my reference. This was not a very good reference so the next task is to scrape a reference surface. Oh joy - blue fingers over the weekend then! Once the horizontal surfaces are complete I will then check the other two surfaces of the dovetail are parallel.
    Last edited by Andrew Wilding; 08-06-2011 at 09:57 PM. Reason: added comments

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. RFQ: Require small Stainless steel buckles machining- can you help please ?
    By Gasgasbones in forum Projects, Jobs & Requests
    Replies: 0
    Last Post: 15-05-2013, 06:47 AM
  2. Replies: 25
    Last Post: 03-05-2013, 09:31 AM
  3. RFQ: small cutout panel 66mm x 44mm - stainless steel 1mm thick
    By dsc in forum Projects, Jobs & Requests
    Replies: 2
    Last Post: 18-06-2012, 09:47 AM
  4. RFQ: small machining job??
    By Wobblybootie in forum Projects, Jobs & Requests
    Replies: 8
    Last Post: 25-02-2011, 01:04 PM
  5. Request for two small steel rod-esque lathed part!
    By HankMcSpank in forum General Discussion
    Replies: 42
    Last Post: 29-06-2009, 02:32 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •