Thread: Web Goblin cnc has begun
Hybrid View
-
19-01-2011 #1
Chip,
I will be using 20mm diameter 5mm lead screws from Gary at Zapp. Once the paint on the mounts has dried I will fit the motor mounts with one bolt and clamp the end bearing in place to get a measure on the screws then get them made to fit. I already have the motor mounts and the bearings to suit the screws. The linear rail is 25mm and I think it was around £150 per meter. Its not cheap but its very good. I will be using 15mm Linear rail for the Y-axis because I have three lengths of it spare from an old job. It will also be more than enough for the machine.
Andy,
most of ther uk profle that I have seen has either 6,8 or 10mm wide slots. I dont know if the american stuff will still be in imperial sizes so it might not fit very well at all. The valuframe stuff is great stuff. Thats what I have used for my build except for the wider 275mm profle for the y-axis riser plates because the valuframe range only goes to 200mm wide I think. Normally if you are using a rack and pinion drive I would space it out from the edge of the frame by maybe 2mm and centre the drive pinion to the rack so that it would have a little bit of float. The good thing about rack and pinion is that it can float about a bit and not cause any problems and also if your gearbox/motor assembly is spring loaded it helps to keep the pinion in mesh and also lets it follow an uneven rack.
Regards
Ian
Thread Information
Users Browsing this Thread
There are currently 14 users browsing this thread. (0 members and 14 guests)
Similar Threads
-
BUILD LOG: It's begun....
By Washout in forum DIY Router Build LogsReplies: 158Last Post: 07-06-2015, 10:03 AM
Bookmarks