. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Right so looks to me like 16 driving 72 with a 24 on the same shaft driving another 24 ? [ not in picture ] ?

    If so the two 24's cancel out at 1:1 and the 16 to 72 gives a 4.5 : 1 reduction x by 1 : 1 is still 4.5 reduction.
    John S -

  2. #2
    Cool that is what i was hoping you would say, shall change the config tonight and give it another go. As you can already guess i was trying to do something with the gear up scenario which does not exist.

    If all is well i will take some proper pics and post the results :-)
    Cheers guys
    If the nagging gets really bad......Get a bigger shed:naughty:

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. 1:1 ratio - pulley sizes
    By dsc in forum Belt Drive, Pulleys & Timing
    Replies: 3
    Last Post: 12-04-2014, 01:30 PM
  2. Cutting HTD pulley(s)
    By Jonathan in forum Metalwork Project Showcase
    Replies: 2
    Last Post: 11-12-2012, 07:19 PM
  3. pulley dims for boxford csb
    By onecut in forum Boxford Lathes
    Replies: 5
    Last Post: 23-09-2012, 04:58 PM
  4. 4th Axis timing pulley + Axminster bandsaw review
    By Jonathan in forum Metalwork Project Showcase
    Replies: 4
    Last Post: 09-04-2011, 07:31 PM
  5. WANTED: Timing Pulley Suppliers?
    By m_c in forum Items Wanted
    Replies: 4
    Last Post: 02-11-2008, 01:02 AM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •