Jes Have you got the wiring earthed ?? and the machine earthed ??
James
-
03-04-2012 #2
Things to check.
Check VFD Shield wires goto ground, VFD is one of the few execptions where it's ok and even recommended by some manufacturers to ground both ends of the sheild.
No signal wires, so steppers,estop etc run along side VFD cables or even along side any power cables.
Don't cable tie signal wires together or along side power wires.
Use a Star grounding in control box.
Double check all connections for lose wires, Esp the earth.
Does it only do it when spindle starts or when you actually turn the VFD on.?
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Aluminium box section
By martin54 in forum Gantry/Router Machines & BuildingReplies: 11Last Post: 28-10-2012, 01:13 AM -
First Aluminium cut
By luke11cnc in forum Computer SoftwareReplies: 15Last Post: 24-02-2012, 09:39 AM -
RFQ: Aluminium sculpture to be CNC'ed
By dav in forum Projects, Jobs & RequestsReplies: 6Last Post: 07-01-2012, 04:37 PM -
Aluminium passivation - for aluminium to be used outside
By CHudson in forum Metal Finishing TechniquesReplies: 4Last Post: 06-04-2011, 09:18 PM -
MDF or Aluminium
By rob_colby in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 24-10-2010, 09:36 PM
Bookmarks