Thread: 1st Build, Second machine
Threaded View
-
23-02-2012 #17
Had to cancel the online order from Maplin as it would have not been in stock till the 19th of March and thanks to Bruce giving me a lift to the Maplin that did have the plugs I am now to the stage of final soldering tomorrow morning and then tomorrow afternoon if I am able to get all ten plugs and sockets that need soldering done I will start on the test runs to see how things go and get everything moving. Hopefully I will have video up tomorrow night, if not Saturday will be test and running day to see how thing go and get ready for doing some cutting. I still need to get the X axis IGUS chain to help protect the cables and will be cutting the brackets to hold that in place. Monday I will be ordering some HDPE to get bolted down to the sub bed and surfaced. Once that is done and the test cuts done I will be very busy.
Michael
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
CNC Build - TEP milling machine conversion
By craynerd in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 06-07-2015, 02:09 AM -
Someone to help me build a machine
By mandev in forum Gantry/Router Machines & BuildingReplies: 8Last Post: 29-01-2014, 02:07 PM -
DIY Machine to Build?
By paulkane1 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 03-12-2012, 02:24 PM -
NEW MEMBER: Second machine build
By tmsboss in forum New Member IntroductionsReplies: 1Last Post: 04-09-2010, 01:11 PM -
Best Type of Machine to Build?
By Kevin in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 05-08-2009, 02:50 PM
Bookmarks