Thread: 1st Build, Second machine
Threaded View
-
29-03-2012 #34
Well a small but important update.
Home and limit switches cut and installed. Tuning of the motors now within needed tolerances (.02mm or less, repeatable), going to be tramming the spindle tomorrow as that needs to be done for doing large surface cutting. Then it is time to cut and cut and cut. I might not be on often for a week or two as I get all the cutting done, but will try to post some more video.
Again thanks to all the folks that helped with this.
Michael
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
CNC Build - TEP milling machine conversion
By craynerd in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 06-07-2015, 02:09 AM -
Someone to help me build a machine
By mandev in forum Gantry/Router Machines & BuildingReplies: 8Last Post: 29-01-2014, 02:07 PM -
DIY Machine to Build?
By paulkane1 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 03-12-2012, 02:24 PM -
NEW MEMBER: Second machine build
By tmsboss in forum New Member IntroductionsReplies: 1Last Post: 04-09-2010, 01:11 PM -
Best Type of Machine to Build?
By Kevin in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 05-08-2009, 02:50 PM
Bookmarks