Thread: 1st Build, Second machine
Threaded View
-
05-09-2011 #10
Okay,
Now you really got me thinking of ways to not only improve what I have but make the new one even better. Also with the two carriage stacked like that on the Z I would assume that you need to increase the length of plate to allow the travel I want to attain. Which might not be a problem. Though would only one set of carriages on each side for the current rebuild be enough with only 150 -175mm of travel.
Hope to get some drawings done tonight and trying to figure out a space issue with the required space for the Z leadscrew and backlash nut/mounting bracket versus the height that the rails and carriage require to function. Looks like I will be needing to mill some stock down with not only datum slots but also with channel to allow space for the screw. I have access to 12mm Alli' for sure and might have access to thicker. Having said that would milling the 12mm down to a 6mm channel in the centre reduce strength below the desired levels? I am still learning metal and it tolerances and what it can and can not do. Which is different then what i do with metal for making reeds in many fashions as there you want the metal to bend.
Michael
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
CNC Build - TEP milling machine conversion
By craynerd in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 06-07-2015, 02:09 AM -
Someone to help me build a machine
By mandev in forum Gantry/Router Machines & BuildingReplies: 8Last Post: 29-01-2014, 02:07 PM -
DIY Machine to Build?
By paulkane1 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 03-12-2012, 02:24 PM -
NEW MEMBER: Second machine build
By tmsboss in forum New Member IntroductionsReplies: 1Last Post: 04-09-2010, 01:11 PM -
Best Type of Machine to Build?
By Kevin in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 05-08-2009, 02:50 PM
Bookmarks