Thread: 1st Build, Second machine
Threaded View
-
05-09-2011 #10
Okay,
Now you really got me thinking of ways to not only improve what I have but make the new one even better. Also with the two carriage stacked like that on the Z I would assume that you need to increase the length of plate to allow the travel I want to attain. Which might not be a problem. Though would only one set of carriages on each side for the current rebuild be enough with only 150 -175mm of travel.
Hope to get some drawings done tonight and trying to figure out a space issue with the required space for the Z leadscrew and backlash nut/mounting bracket versus the height that the rails and carriage require to function. Looks like I will be needing to mill some stock down with not only datum slots but also with channel to allow space for the screw. I have access to 12mm Alli' for sure and might have access to thicker. Having said that would milling the 12mm down to a 6mm channel in the centre reduce strength below the desired levels? I am still learning metal and it tolerances and what it can and can not do. Which is different then what i do with metal for making reeds in many fashions as there you want the metal to bend.
Michael
Thread Information
Users Browsing this Thread
There are currently 19 users browsing this thread. (0 members and 19 guests)
Similar Threads
-
CNC Build - TEP milling machine conversion
By craynerd in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 06-07-2015, 02:09 AM -
Someone to help me build a machine
By mandev in forum Gantry/Router Machines & BuildingReplies: 8Last Post: 29-01-2014, 02:07 PM -
DIY Machine to Build?
By paulkane1 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 03-12-2012, 02:24 PM -
NEW MEMBER: Second machine build
By tmsboss in forum New Member IntroductionsReplies: 1Last Post: 04-09-2010, 01:11 PM -
Best Type of Machine to Build?
By Kevin in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 05-08-2009, 02:50 PM



Reply With Quote
Bookmarks