Thread: 1st Build, Second machine
Hybrid View
-
18-09-2011 #1
Okay,
Further drawing, as promised. With additional information.
Uprights of gantry are currently looking to be either 20 to 25mm (or 3/4 to1") thick. The rails are bolted down to 25 x 38mm bars that are going to be bolted to the back plate (12mm). The Z base plate is 20 (or 3/4") . I hope the way I had the jpeg done allows folks to see more of what is going on without getting a headache. This is a rough sketch done with ViaCAD 2D/3D and no I don't own any part of the company nor have vested interest in it.
Any and all opinions are please.
Michael
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
CNC Build - TEP milling machine conversion
By craynerd in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 06-07-2015, 02:09 AM -
Someone to help me build a machine
By mandev in forum Gantry/Router Machines & BuildingReplies: 8Last Post: 29-01-2014, 02:07 PM -
DIY Machine to Build?
By paulkane1 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 03-12-2012, 02:24 PM -
NEW MEMBER: Second machine build
By tmsboss in forum New Member IntroductionsReplies: 1Last Post: 04-09-2010, 01:11 PM -
Best Type of Machine to Build?
By Kevin in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 05-08-2009, 02:50 PM
Bookmarks