Thread: 1st Build, Second machine
Threaded View
-
13-10-2011 #11
Well folks,
work and payment recieved have come together to allow me to get the pieces together to buil the model I have below. Support round rails ordered (Thanks Jonathan for challenging my idea and sorry JAZZ for not contacting you first). The rails and 2 of the carriages will be coming from Jonathan. The other 4 carriages and two rails for Y axis JAZZ has helped with me getting. DumpsterCNC anti-backlash nuts ordered and in route via post. Just need to get a hold of JAZZ on cutting and where to have the metal sent to. Also need to get a hold of m_c for the modification on the pieces that are here.
JAZZ or Jonathan (Heck anyone with more experience then me) please speak up on anything you might see wrong with the design. NO, not all bolt holes have been put into the model yet. Yo uwould be surpirsed how much time doingthat and making sure that there is no conflicts and enough Metal to grab. No the motor mounts are not all present and the gear i put in the top of Z keeps vanishing.
Thanks for all the advice and will get pic's up when all the pieces go together.
Michael
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
CNC Build - TEP milling machine conversion
By craynerd in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 06-07-2015, 02:09 AM -
Someone to help me build a machine
By mandev in forum Gantry/Router Machines & BuildingReplies: 8Last Post: 29-01-2014, 02:07 PM -
DIY Machine to Build?
By paulkane1 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 03-12-2012, 02:24 PM -
NEW MEMBER: Second machine build
By tmsboss in forum New Member IntroductionsReplies: 1Last Post: 04-09-2010, 01:11 PM -
Best Type of Machine to Build?
By Kevin in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 05-08-2009, 02:50 PM



Reply With Quote
Bookmarks