Thread: 1st Build, Second machine
Threaded View
-
16-02-2012 #11
Well power supply is connected to drivers and no smoke (thank goodness as Jazz would kill me). Fuses in place (using the fuse box I have until I can get the 5A fuse bars for the G bar fuse holders) and waiting on the 4 pin chassis plugs to arrive tomorrow (though I had enough and Maplin was out at the local store). So all things go well should have the base wiring done tomorrow and can test. Already have set A axis to slave in Mach3 and will triple check that before I run anything. So things are going to get interesting shortly (in a positive way).
Michael
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
CNC Build - TEP milling machine conversion
By craynerd in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 06-07-2015, 02:09 AM -
Someone to help me build a machine
By mandev in forum Gantry/Router Machines & BuildingReplies: 8Last Post: 29-01-2014, 02:07 PM -
DIY Machine to Build?
By paulkane1 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 03-12-2012, 02:24 PM -
NEW MEMBER: Second machine build
By tmsboss in forum New Member IntroductionsReplies: 1Last Post: 04-09-2010, 01:11 PM -
Best Type of Machine to Build?
By Kevin in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 05-08-2009, 02:50 PM
Bookmarks