Well the work bed is drill the inserts put into the sub bed and work bed bolted down. I will be making the g-code for the brackets to hold the homing switches and sourcing some copper plate for tool changer and Zero setting probe. Also need to set up the wiring for that and get things moving on. Will post pictures and links to the cutting later tonight. Been a long 12.5 hour day in the shop or office and not done yet, but getting progress and working well.

Also been working with the tuning of the motors and that has solved a few issues. It hums nicely now and no jerkiness with movement or making pockets. It feels real good to get this far and be at the point where cutting product is within sight.

Michael