Thread: 1st Build, Second machine
Threaded View
-
18-09-2012 #38
Yep,
That was 2.5 m/min, though at that time I was only using about 500 mm/sec^2 acceleration. That and surfacing 850 mm by 350 mm does take a bit of time even at that speed I will be cutting some combs tomorrow and should be able to show what 1.8 m/min looks like in a small area. The difference being 1250 mm/sec^2 acceleration and using much higher quality electronic control hardware.
As it is need to be looking into a better swarf shield then what I am currently using or a way to improve it. The plastic sheeting I am using for the curtain is curling in at the bottom and opening gaps.
Michael.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
CNC Build - TEP milling machine conversion
By craynerd in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 06-07-2015, 02:09 AM -
Someone to help me build a machine
By mandev in forum Gantry/Router Machines & BuildingReplies: 8Last Post: 29-01-2014, 02:07 PM -
DIY Machine to Build?
By paulkane1 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 03-12-2012, 02:24 PM -
NEW MEMBER: Second machine build
By tmsboss in forum New Member IntroductionsReplies: 1Last Post: 04-09-2010, 01:11 PM -
Best Type of Machine to Build?
By Kevin in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 05-08-2009, 02:50 PM



Reply With Quote
Bookmarks