If your planning to leave in same place all time then I'd just bolt it down something like level then epoxy level.

If your planning to build off the pad then yes it's worth taking time to get flat and level. THE most important bit is building off a flat surface that's not in twist.

Have thought about epoxy levelling the floor.? When I worked for Honda we had epoxy levelled pads for accurately setting Suspension.