Once again thanks Dean, I will weigh up the pros and cons for what we are likely to be machining in the near future.

So I spent yesterday dismantling the z axis as I knew there were a few things I needed to take care of before I was happy to say that was done. One of them being some proper mounts for the spindle being as the ones on there were temporary polycarb ones.

I have drilled the plates for the pinch bolt just have not put the slot in it yet so I will be doing that shortly however I wanted to get all the covers made up whilst it was off the machine and easy to access.

I have also put in place the holes for the internal pipes I am putting in for the coolant / mist / blower system - more on this to come but there will be 4 small heads which will direct the air/mist relevant to the path of the cut as the machine moves around. Similar to the datron system Dean pointed out earlier in the thread. Currently waiting on some solenoid valves to turn up for this so I thought I would prep the pieces ready.
Click image for larger version. 

Name:	IMG_9103.JPG 
Views:	469 
Size:	655.2 KB 
ID:	15087Click image for larger version. 

Name:	IMG_9105.JPG 
Views:	394 
Size:	408.6 KB 
ID:	15088Click image for larger version. 

Name:	IMG_9106.JPG 
Views:	367 
Size:	499.6 KB 
ID:	15089Click image for larger version. 

Name:	IMG_9108.JPG 
Views:	453 
Size:	442.2 KB 
ID:	15091Click image for larger version. 

Name:	IMG_9107.JPG 
Views:	458 
Size:	422.9 KB 
ID:	15090