Thread: Plasma Attempt #2
Threaded View
-
08-06-2012 #13
Bolting the HiWin rail from behind on to box section meant running spacers inside. I used 3/4" aluminium bar
I suggest we make a tool to place them, my son thinks he can push them into position using the file with a 1.5m handle we used to deburr the hole internals. The 23 bolts only took him a couple of hours, I cut the spacers for a good fit, after about an hour of hammering and cussing I remembered I had some copper-slip
Thought I'd get a pic before he welds in the end plates and the spacers are never seen again.
The rail mounting holes are drilled oversize so I can put the rail level even if the box section sags a bit.
I have a cunning plan to mill the gantry ends dead square
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
ok, first attempt using sketchup 8
By deannos in forum Gantry/Router Machines & BuildingReplies: 89Last Post: 25-08-2012, 03:00 PM -
BUILD LOG: My first attempt.... 8 x 4
By trounce in forum DIY Router Build LogsReplies: 0Last Post: 18-10-2011, 11:31 AM -
BUILD LOG: My First Attempt Of A CNC
By AdCNC in forum DIY Router Build LogsReplies: 61Last Post: 21-10-2010, 03:55 PM -
help please with first attempt
By phill05 in forum Machine DiscussionReplies: 13Last Post: 01-06-2010, 05:42 PM -
FeatureCam - first attempt
By HiltonSteve in forum CAD & CAM SoftwareReplies: 0Last Post: 01-09-2009, 07:46 PM
Bookmarks