Had thought about that but my router is in regular use and the base doesn't allow cutting thru without a redesign.
So by the time you have redesigned it you have built a new machine. with my workload this could take up to a year in the doing and to be honest if it cuts thin ply anything like, the first job, which will fit in two hands, will pay for it.