That sounds a bit excessive to me.
All our sheds with concrete floors are on 10-12" type 1, then 6inch of reinforced concrete, with the damproof membrane below the concrete and brought out and up over enough layers of bricks to ensure it's above ground level. And those floors have had a fair bit of abuse (3 tonne forklift running over them, jacking up various tractors)
Only place near us thats got a 12" float foundation is the neighbours newbuild, as the test bore revealed mine workings below. All the original houses are on strip founds and none of them have fallen down yet! And all his damproofing went below the concrete.
One thing I would say, plan for insulation in the walls, but make sure you build the roof with insulation (i.e. suitably vented with insulation below). The one regret I've got is not doing the workshop roof properly for insulation. I do plan on insulating it, however it's not feasible to vent it properly, so it will probably eventually rot the main beams :-/
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Building 2nd machine smaller one
By Timo in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 10-06-2014, 03:10 AM -
Thinking of buying/building machine for PCB milling
By njh in forum Marketplace DiscussionReplies: 32Last Post: 11-10-2013, 07:35 PM -
New Workshop
By Washout in forum Workshop & EquipmentReplies: 13Last Post: 26-12-2012, 10:22 PM -
NEW MEMBER: CNC and other Machine Building Berlin
By Andikid in forum New Member IntroductionsReplies: 1Last Post: 07-10-2010, 11:30 PM
Bookmarks