Hybrid View
-
08-10-2012 #1
Thanks Peter... Mocha has also offered, but its the logistics that always defeat these things... so the more offers the better - let me know if you have one...
Oh btw , heres the paddling pool of porridge... :(
hmmm... not sure where to send the water... the nearest drain/sewer is about 10m or so towards the camera... it cant go left or back as thats uphill... and right means flooding the back of the neighbours garden.... so drain/sewer it is... so I'll need some 10m or so of 1.5" or 2" flat hose or whatever the pump takes...
-
08-10-2012 #2
You don't need 2" for that little amount, some 1/2" hose on a little hippo pump would clear that in 30 mins and easily keep up with any incoming. A 2" pump would drain that lot in probably 2 minutes.
-
08-10-2012 #3
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Building 2nd machine smaller one
By Timo in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 10-06-2014, 03:10 AM -
Thinking of buying/building machine for PCB milling
By njh in forum Marketplace DiscussionReplies: 32Last Post: 11-10-2013, 07:35 PM -
New Workshop
By Washout in forum Workshop & EquipmentReplies: 13Last Post: 26-12-2012, 10:22 PM -
NEW MEMBER: CNC and other Machine Building Berlin
By Andikid in forum New Member IntroductionsReplies: 1Last Post: 07-10-2010, 11:30 PM
Bookmarks