believe me if i started this machine right now my mrs would lynch me.

i've got a bubble tube to finish which i am waiting on a pump to arrive from germany to finish off. i've also got to re-build the cabinet for the front room, now both of these HAVE to be done before i do anything else.

i also want to get my homebrew on the go which needs a circuit building for temperature control, which i have yet to even design, plus it then needs an enclosure. i would like to do this before i start work on the machine.

so as it stands i think i'm happy with my design but i need to clear some stuff out of the garage before i start it, gonna have a good push this weekend to get at least one thing done.

i should have got some of it done over christmas but being ill and one of my lads being ill didnt help and more importantly i had no money left over to buy stuff with