. .

Thread: It's begun....

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #22
    Evening all,
    .
    A quick pic showing some more progress since my last post:
    .
    This one shows:
    a new and longer air line,
    a remount of the "mixer" block so I don't lose any Y axis travel
    the coolant/cutting fluid line attached and also a reservoir for the fluid on the top of the gantry at the back
    .
    The only thing I am missing now is a 1/4" male to 1/8" male adapter for the air line (its current position is "fake" as a "dry run" and the connector there is a mock one from a PC cooling system. Hopefully the adapter arrives soon or I'll have to work out how to setup my lathe for threading (if it can cut BSP - it does metric and imperial).
    .
    Later
    .
    .
    Chris
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	WP_20140116_001.jpg 
Views:	569 
Size:	699.7 KB 
ID:	11315  

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: Web Goblin cnc has begun
    By Web Goblin in forum DIY Router Build Logs
    Replies: 147
    Last Post: 12-02-2012, 08:49 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •