Thread: It's begun....
Threaded View
-
18-01-2014 #22
Evening all,
.
A quick pic showing some more progress since my last post:
.
This one shows:
a new and longer air line,
a remount of the "mixer" block so I don't lose any Y axis travel
the coolant/cutting fluid line attached and also a reservoir for the fluid on the top of the gantry at the back
.
The only thing I am missing now is a 1/4" male to 1/8" male adapter for the air line (its current position is "fake" as a "dry run" and the connector there is a mock one from a PC cooling system. Hopefully the adapter arrives soon or I'll have to work out how to setup my lathe for threading (if it can cut BSP - it does metric and imperial).
.
Later
.
.
Chris
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: Web Goblin cnc has begun
By Web Goblin in forum DIY Router Build LogsReplies: 147Last Post: 12-02-2012, 08:49 PM



Reply With Quote
Bookmarks