Thanks all for offers of help. i'm trying to sort out a local storage facility. the main thing to be moved is the md30 mill @ 300kg approx. Could be moved as is, or head and table removed and unbolted from stand and moved as 4 parts. Then there is the minilathe, 5 other lathes, one mounted with motor on workbench (needs unbolting or could be moved with bench with skates and enough grunt),the MaxNC10 mill, 4 bikes, the contents of 2 4-shelf storage units, air compressor, approx 5 plastic crates of tooling etc, bench grinder and a load of wood/contiboard. Apart from the big mill nothing is more than a one-man lift.