Thread: My build log
Threaded View
-
14-02-2013 #13
More progress today with the workshop.
the floor in place with the membrane on the underside to stop dampness.
18mm ply fitted to floor
left hand side with membrane to stop drafts and damp
osb fitted creosote and old engine oil appleid
left hand side in place (bloody heavy bugger lol)
Tomoro will see right hand side and gable end in place. Possibly the roof frames on as well.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: New Build - For Your Amusement - MK-2 build
By Karl in forum DIY Router Build LogsReplies: 12Last Post: 08-02-2017, 08:03 PM
Bookmarks