Quote Originally Posted by m.marino View Post
That is over price crap. Even with the cost a CE mark an the required insurance an overhead. You could build better then that an have both the machine an training experience together.

Michael
Careful Micheal last time I called something "Over priced crap" I got Banned or nearly Banned . . Lol