Quote Originally Posted by 2e0poz View Post
In Mach it should be configured for 400 steps
Well that depends on Screws it using and if it's using 5mm pitch like I suspect then thats wrong Steps per should be 80 at 1/2 stepping not 400.

Handywoodman to check the pitch of the screw turn 1 revolution of each axis and measure distance travelled.