Threaded View
-
16-04-2013 #22
On top of this make sure there's room or spacing for a Lead-in and lead-out or ramping etc otherwise it means plunging into material and person doing cutting wont thank you for that.!
Really your better letting the person doing the cutting setup the layout to suit there clampings methods and machine.? If you try to cut it too fine on material it's easy to get into trouble so better having a little extra for safety sake.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: starting from scratch- router 1st project
By idefix in forum DIY Router Build LogsReplies: 24Last Post: 10-01-2014, 12:53 AM -
NEW MEMBER: Have Built 2 CNC machines 1 mill/drill conversion and 1 Router/plasma from scratch
By AGB in forum New Member IntroductionsReplies: 3Last Post: 06-02-2013, 03:16 AM -
Hypertherm Duramax Torches to upgrade Powermax 1000 & Powermax 1250
By Hypertherm John in forum Manufacturer NewsReplies: 0Last Post: 04-03-2011, 03:26 PM -
Building from Scratch or follow some plans?
By Monk in forum Gantry/Router Machines & BuildingReplies: 22Last Post: 12-08-2010, 10:27 PM -
Need helpwiring up from scratch
By GeorgeD in forum Machine DiscussionReplies: 40Last Post: 13-07-2010, 06:23 PM
Bookmarks