Threaded View
-
19-03-2013 #6
Yeh bud, if your milling a datum edge in for locating the rails then the machine your using to mill the datum with will have to be cock-on!
Regarding the blocks you always mount the rails like this and let the blocks find there own parallelism. So for instance when assembling a z axis mount one rail up agains the datum edge then mount the second, as for when you aline the second rail to the first; mount a bearing block on the first rail thats correctly mounted the attach a magnetic block and gauge to clock the second rail! This is a method of checking if you have milled both rails a datum edge or a way of aligning if you are using a single datum edge. then mount all the blocks and attach the second plate then attach a gauge to this and align this plate to either the first rail or the first plate (taking in consideration that the plates have good milled edges.)
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Tsk profile rail preloads?
By totts in forum Rails, Guideways & BearingsReplies: 2Last Post: 19-04-2014, 07:44 PM -
FOR SALE: New Hiwin HGH15 bearing blocks / carriages profile rail
By Jonathan in forum Items For SaleReplies: 0Last Post: 06-11-2011, 05:26 PM -
hiwin profiled rail
By jonm in forum Rails, Guideways & BearingsReplies: 7Last Post: 07-08-2010, 06:48 PM -
Hiwin Profiled Rail Question
By Normsthename in forum Marketplace DiscussionReplies: 8Last Post: 02-08-2010, 07:02 PM -
WANTED: WANTED: HIWIN LG25 rail
By Smiler in forum Items WantedReplies: 1Last Post: 01-03-2009, 08:13 PM
Bookmarks