Hybrid View
-
16-03-2013 #1
Gents,
this is mostly for the people who used or use Hiwin rails.
Looking at the Hiwin technical manual:
http://www.hiwin.com/pdf/lg/QE/QE-Li...ay-%28E%29.pdf
page 11 , there's a whole section on how to mount the rails and carriages.
I've seen many machines which use Hiwins and only a few times I've seen the rails mounted against a datum line, even rarer with side plates used for securing the rail. Curious how many of you followed the Hiwin manual and how many simply slap the rails on a flat plate and bolt it when everything is aligned? Am I correct to think the suggested mounting methods are for high loads, not normally seen on home built machines?
Regards,
dsc.
-
16-03-2013 #2
It's to do with ensuring the blocks/rails can't move, and allows easier assembly.
Relying on bolts alone means that under high loads (especially shock loads), the blocks/rails could slip. By ensuring they're mounted firmly against an edge ensures they won't move.
Also by using datum edges, it makes assembly quicker and more accurate. Most machines using linear rails will be getting machined anyway, so adding a datum edge isn't a major issue, and saves quite a bit of time in mounting and adjusting the rails/blocks. For one offs, it's probably not a major benefit, but if you're producing multiples of the same machine, that additional time mounts up.
-
17-03-2013 #3
I always incorporate a datum edge when i build a new machine i have done ever since i built my first machine.. and always used hi-win gear.
-
17-03-2013 #4
Where are they on the first machine, they look well hidden to me...
http://www.mycncuk.com/forums/router...tempt-cnc.html
To make a datum/reference edge you need a milling/grinding machine with as much travel as the length of the rail or maybe a long precision straight edge to use as a reference. Either way it's not realistic for the vast majority of people on the forum.Last edited by Jonathan; 17-03-2013 at 01:56 AM.
-
17-03-2013 #5
So how do people get around this problem. I'm very interested as I will be facing this problem soon.
-
17-03-2013 #6
Gents,
thank you for the replies.
Looking at the manual, you can do without having a datum edge for the rails (ie. use the edge of the plate as datum), but the carriages still need a 'lip' and side bolts to secure in place.
Regards,
dsc.
-
19-03-2013 #7
Yeh bud, if your milling a datum edge in for locating the rails then the machine your using to mill the datum with will have to be cock-on!
Regarding the blocks you always mount the rails like this and let the blocks find there own parallelism. So for instance when assembling a z axis mount one rail up agains the datum edge then mount the second, as for when you aline the second rail to the first; mount a bearing block on the first rail thats correctly mounted the attach a magnetic block and gauge to clock the second rail! This is a method of checking if you have milled both rails a datum edge or a way of aligning if you are using a single datum edge. then mount all the blocks and attach the second plate then attach a gauge to this and align this plate to either the first rail or the first plate (taking in consideration that the plates have good milled edges.)
-
19-03-2013 #8
That's what I thought Ad (ie. rail against datum and 'floating' carriages), but for whatever reason the manual suggests going the other way, floating rails and fixed carriage.
Regards,
dsc.
-
11-12-2013 #9
Just a quick question again on the linear rail installation. Hiwin manual shows this:
So master rail bolted, three linear blocks bolted to the axis plate and moving the thing up / down, bolting the second rail at the same time to make sure it's all parallel. This assumes that the two left-hand side linear blocks on the axis plate are in the same line ie. same distance from the edge and the third one is on a line parallel to those.
I have the master rail bolted down and it's pretty much parallel to the edge (within 0.005mm). I also have one block on the master side bolted and it's also cock on parallel to the axis plate (within 0.002mm). Is it a good idea to loosely mount the second linear block on the master side, slide [both blocks + axis plate] on the master rail and then bolt down the second linear block to make sure both blocks are on the same line / parallel? The whole process would go like this:
This means effectively using the master rail as a reference line, according to which two linear blocks are set in the same line.
Regards,
dsc.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Tsk profile rail preloads?
By totts in forum Rails, Guideways & BearingsReplies: 2Last Post: 19-04-2014, 07:44 PM -
FOR SALE: New Hiwin HGH15 bearing blocks / carriages profile rail
By Jonathan in forum Items For SaleReplies: 0Last Post: 06-11-2011, 05:26 PM -
hiwin profiled rail
By jonm in forum Rails, Guideways & BearingsReplies: 7Last Post: 07-08-2010, 06:48 PM -
Hiwin Profiled Rail Question
By Normsthename in forum Marketplace DiscussionReplies: 8Last Post: 02-08-2010, 07:02 PM -
WANTED: WANTED: HIWIN LG25 rail
By Smiler in forum Items WantedReplies: 1Last Post: 01-03-2009, 08:13 PM
Bookmarks