Threaded View
-
10-02-2014 #21
Obviously section 1.10 of the Hiwin manual is the 'correct' method but if you don't have the gear . . .
To mount rails similar to yours, I first clamped a straight edge along the top with the edge parallel to the beam and for the Hiwin rail to be in the centre.
Then I clamped the Hiwin rail to the beam making sure it was tight up against the straight edge. The holes in the rail are about 5.5mm diameter so I used a 5.5mm drill in every mounting hole to make a dimple in the epoxy similar to using a centre punch. This allowed my 4.2mm tapping drill to go right through the epoxy and beam, all central to the Hiwin mounting holes. The other rail was mounted in a similar way but using a DTI gauge to keep them parallel.Last edited by EddyCurrent; 10-02-2014 at 02:54 PM.
Spelling mistakes are not intentional, I only seem to see them some time after I've posted
-
The Following 2 Users Say Thank You to EddyCurrent For This Useful Post:
Thread Information
Users Browsing this Thread
There are currently 2 users browsing this thread. (0 members and 2 guests)
Similar Threads
-
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM -
Need help, buy or build to cut steel, stainless steel, titanium etc
By fatguyslim in forum Machine DiscussionReplies: 41Last Post: 08-02-2014, 11:37 PM -
A Sturdy Steel Framed Machine Design
By Boyan Silyavski in forum Machine Frames & BedsReplies: 0Last Post: 06-11-2013, 05:58 PM -
BUILD LOG: 7' X 4' Steel frame build
By Ricardoco in forum DIY Router Build LogsReplies: 6Last Post: 28-10-2012, 06:02 PM
Bookmarks