. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Looks like a good machine for cutting wood. I'd certainly add some diagonals to the frame, make the motor mounts a bit stronger and also include a dust extraction system. You could also use a longer top rail on the Y-axis and increase just the top bearing spacing substantially. That would increase the stiffness of that axis noticeably.

    I particularly like the 4th axis motor mount
    Last edited by Jonathan; 05-09-2013 at 09:31 PM.
    Old router build log here. New router build log here. Lathe build log here.
    Electric motorbike project here.

  2. #2
    Great Job!
    Thanks for sharing the photos & info.

    You did that in a month!!! That's very impressive.

    Cheers
    Greeny

    btw. Like the video. Never seen anyone V-carving cheese before!

  3. #3
    It's a great looking machine, your welding is spot on but how are the top members of the frame fastened on ? the ones where the linear rails fasten to, I can't see any weld on the inside joints. If they are welded on then how do you level the linear rails on top of them ? because there would be no means of adjustment with shims etc.

  4. #4
    Matt, that is an impressive build, and your welding skills are excellent.
    I think I'm becoming slightly envious. Lol

  5. #5
    Quote Originally Posted by EddyCurrent View Post
    how are the top members of the frame fastened on ? the ones where the linear rails fasten to, I can't see any weld on the inside joints.
    they are welded, just not on the inside

    Quote Originally Posted by EddyCurrent View Post
    If they are welded on then how do you level the linear rails on top of them ? because there would be no means of adjustment with shims etc.
    In actual fact the top members were sat on top of the frame, which was in-turn sat on my relatively uneven garage floor. I then measured best I could with a spirit level before tacking them inplace.
    I then made the gantry, double checked, before welding them solid. Maybe not the best method IMO, sometimes, you just need to get on with it, and not worry to much about the obvious. Otherwise you wont get anything done. Both times its been accurate enough, especially as there is some adjustment in the bed. The dti guage showed (once the bed was on) there was negligible twist. when tracking the gantry around dragging the dti on the bed.

    "A little less conversation, a little more action"
    Last edited by kingcreaky; 06-09-2013 at 12:29 PM.

  6. The Following User Says Thank You to kingcreaky For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 9 users browsing this thread. (0 members and 9 guests)

Similar Threads

  1. Replies: 0
    Last Post: 18-09-2013, 05:28 AM
  2. BUILD LOG: 10 month cnc project
    By viz in forum DIY Router Build Logs
    Replies: 8
    Last Post: 24-02-2013, 07:52 PM
  3. 3 Month Contract Mechanical Designer Solidworks
    By petesurrey in forum Opportunities Available & Sought
    Replies: 0
    Last Post: 13-09-2012, 11:06 AM
  4. Warco Super Major Mill 3 month old
    By grimreaper in forum Milling Machines, Builds & Conversions
    Replies: 6
    Last Post: 18-07-2010, 02:50 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •