06-09-2013 #7
they are welded, just not on the inside
In actual fact the top members were sat on top of the frame, which was in-turn sat on my relatively uneven garage floor. I then measured best I could with a spirit level before tacking them inplace.
I then made the gantry, double checked, before welding them solid. Maybe not the best method IMO, sometimes, you just need to get on with it, and not worry to much about the obvious. Otherwise you wont get anything done. Both times its been accurate enough, especially as there is some adjustment in the bed. The dti guage showed (once the bed was on) there was negligible twist. when tracking the gantry around dragging the dti on the bed.
"A little less conversation, a little more action"Last edited by kingcreaky; 06-09-2013 at 12:29 PM.
-
The Following User Says Thank You to kingcreaky For This Useful Post:
Thread Information
Users Browsing this Thread
There are currently 15 users browsing this thread. (0 members and 15 guests)
Similar Threads
-
LIMAC knife cutting machine and plasma machine, cnc router latest video
By therouterlady in forum Manufacturer NewsReplies: 0Last Post: 18-09-2013, 05:28 AM -
BUILD LOG: 10 month cnc project
By viz in forum DIY Router Build LogsReplies: 8Last Post: 24-02-2013, 07:52 PM -
3 Month Contract Mechanical Designer Solidworks
By petesurrey in forum Opportunities Available & SoughtReplies: 0Last Post: 13-09-2012, 11:06 AM -
Warco Super Major Mill 3 month old
By grimreaper in forum Milling Machines, Builds & ConversionsReplies: 6Last Post: 18-07-2010, 02:50 PM
Bookmarks