Thread: Ready Steady Eddy
Threaded View
-
16-09-2013 #11
The reason I used box section for gantry sides was due to large strength advantage over plates.
I thought this might be an idea for attachment of sides to aluminium.
By welding a plate (with nuts welded to the back of it) about 6mm in from the end of the box section, I could easily file the box profile edges to 90deg. I suppose you could then fill the 6mm deep cavity with epoxy if need be. Maybe use 1/2" plate and drill & tap 4 holes instead of welding nuts behind a thinner plate.
Epoxy plan for gantry horizontal members will be fine.
1. Ball screw bearings moved to outside of frame or as suggested I might use BK/BF instead.
2. Support brackets for sides increased in size
3. I think you are saying that to fit the bearing blocks I need to drill through the ally backplate and use nuts & bolts rather than tapping the backplate and screwing in from each side with set studs ?Last edited by EddyCurrent; 16-09-2013 at 03:42 PM.
Thread Information
Users Browsing this Thread
There are currently 2 users browsing this thread. (0 members and 2 guests)
Similar Threads
-
traveling steady, turning 1/2 bar down over 10".
By graffian in forum Metalwork DiscussionReplies: 3Last Post: 08-05-2013, 07:59 PM -
NEW MEMBER: Hello all, finally ready to start a build log.
By Iwant1 in forum New Member IntroductionsReplies: 11Last Post: 25-12-2012, 06:03 PM -
eBay: Boxford 125 TCL Mach3 Ready
By rnr107 in forum Items On eBay UKReplies: 1Last Post: 25-07-2012, 07:29 AM -
Anyone have experience of ready made machines
By bogstandard in forum Milling Machines, Builds & ConversionsReplies: 9Last Post: 07-04-2010, 07:44 PM -
Windows 7 RTM Confirmed & Ready !
By Lee Roberts in forum Computer SoftwareReplies: 8Last Post: 29-07-2009, 03:33 PM



Reply With Quote
Bookmarks