Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Quote Originally Posted by EddyCurrent View Post
    Well I'll be having the wood burner going anyway, it says the pot life is about 40 minutes so surely that's enough for it to settle ?

    For making the trough I was thinking about using this, do you think the epoxy will eat into it ?

    10x10mm, 1.75M, Foam Sealing Tape Adhesive Strip, Draught Excluder, EPDM Rubber | eBay
    Are you going to make a moat between the two rails so that they will be both at the same level, also the epoxy will rise up at the edges so make sure you have a wide enough flat plane to mount the rails on say at least 10mm each side. ..Clive

  2. The Following User Says Thank You to Clive S For This Useful Post:


  3. #2
    Quote Originally Posted by Clive S View Post
    Are you going to make a moat between the two rails so that they will be both at the same level, also the epoxy will rise up at the edges so make sure you have a wide enough flat plane to mount the rails on say at least 10mm each side. ..Clive
    Yes, maybe one each end, I will leave 10mm each side.

  4. #3
    Quote Originally Posted by Clive S View Post
    Are you going to make a moat between the two rails so that they will be both at the same level, also the epoxy will rise up at the edges so make sure you have a wide enough flat plane to mount the rails on say at least 10mm each side. ..Clive
    Clive, would you say it was easier to drill and tap all the holes for the rails after doing the epoxy?
    Neil...

    Build log...here

  5. #4
    Quote Originally Posted by njhussey View Post
    Clive, would you say it was easier to drill and tap all the holes for the rails after doing the epoxy?
    I take it that you have seen the pics that I posted. When the mdf sides were taken away you will find that the epoxy has crept up the sides a little. I then used a flat file to scrape the high sides away just until you see it marking the centre. I left mine to cure for about 3 days before removing the mdf. I just drilled through the epoxy and steel and then threaded in the normal way. It was way easier than I had thought.

    When mixing the epoxy I did it by weight, I was told by the very helpful people at Wests to mix it in a wide container as that would produce the least heat. There is no problem with mixing it in one or two batches, I also used a hot air gun to flash the surface after it was poured to get rid of any bubbles in the surface. I believe that the proportions of the two part mix should be done accurately . Hope all this helps biggest tip is sealing the moat for leaks before you start as that will give you problems. ..Clive

  6. The Following User Says Thank You to Clive S For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. traveling steady, turning 1/2 bar down over 10".
    By graffian in forum Metalwork Discussion
    Replies: 3
    Last Post: 08-05-2013, 07:59 PM
  2. NEW MEMBER: Hello all, finally ready to start a build log.
    By Iwant1 in forum New Member Introductions
    Replies: 11
    Last Post: 25-12-2012, 06:03 PM
  3. eBay: Boxford 125 TCL Mach3 Ready
    By rnr107 in forum Items On eBay UK
    Replies: 1
    Last Post: 25-07-2012, 07:29 AM
  4. Anyone have experience of ready made machines
    By bogstandard in forum Milling Machines, Builds & Conversions
    Replies: 9
    Last Post: 07-04-2010, 07:44 PM
  5. Windows 7 RTM Confirmed & Ready !
    By Lee Roberts in forum Computer Software
    Replies: 8
    Last Post: 29-07-2009, 03:33 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •