    Once I got the rails fitted to the gantry and the two lower bearing blocks added it was easy to see how to square everything up.
    The gantry is bolted to the carriages at each end, the bolts were left slightly loose until the whole assembly was squared.

    Click image for larger version. 

Name:	gantry20.JPG 
Views:	3244 
Size:	89.7 KB 
ID:	11636

    First an engineers square was adjusted to be exactly 90 deg. by using the flip over method mentioned previously, the fact it's a cheap Aldi one does not matter as you will see.
    As silyavski pointed out recently, the Hiwin rails and bearing blocks have a machined side that should be used as a datum, so to these faces of the lower bearing blocks I clamped the engineers square.

    Click image for larger version. 

Name:	gantry18.JPG 
Views:	3436 
Size:	111.9 KB 
ID:	11637 Click image for larger version. 

Name:	gantry19.jpg 
Views:	3439 
Size:	167.6 KB 
ID:	11638

    All I had to do then was measure the distance between the engineers square and the long rails using a vernier. This was done at the end of the square and right up at the gantry so obviously when they read the same the gantry is at right angles to the long rails. The key point is that it's the two sets of rails that are being squared and not just the gantry frame. Also with regard to the cheap square, it can now be slid over to the other side of the gantry as it's clamped to the bearing blocks, and a similar reading can be made with the vernier. If the square was out of adjustment then the error would be multiplied at this side because the two long rails are exactly parallel. Once everything was adjusted the gantry securing bolts were tightened.
    Last edited by EddyCurrent; 17-02-2014 at 08:58 PM.
    Spelling mistakes are not intentional, I only seem to see them some time after I've posted

  2. The Following User Says Thank You to EddyCurrent For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. traveling steady, turning 1/2 bar down over 10".
    By graffian in forum Metalwork Discussion
    Replies: 3
    Last Post: 08-05-2013, 07:59 PM
  2. NEW MEMBER: Hello all, finally ready to start a build log.
    By Iwant1 in forum New Member Introductions
    Replies: 11
    Last Post: 25-12-2012, 06:03 PM
  3. eBay: Boxford 125 TCL Mach3 Ready
    By rnr107 in forum Items On eBay UK
    Replies: 1
    Last Post: 25-07-2012, 07:29 AM
  4. Anyone have experience of ready made machines
    By bogstandard in forum Milling Machines, Builds & Conversions
    Replies: 9
    Last Post: 07-04-2010, 07:44 PM
  5. Windows 7 RTM Confirmed & Ready !
    By Lee Roberts in forum Computer Software
    Replies: 8
    Last Post: 29-07-2009, 03:33 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •