@Neale, If you intend to weld the top beams to the frame instead of bolting, that's fine, you will of course have to use the epoxy routine. The reason I wanted to bolt them was to avoid the epoxy bit but in the end I still had to do it.
Another reason I had to use epoxy was due to the top beams leaning out slightly. When I tacked and welded them I had two pieces of wood between with perfectly square ends and the whole lot was clamped together with two long sash clamps. I thought this would keep them vertical but unfortunately it did not.
@Mike, Yes I welded all round the pads, you might be right about just welding the sides.Spelling mistakes are not intentional, I only seem to see them some time after I've posted
-
The Following User Says Thank You to EddyCurrent For This Useful Post:
Thread Information
Users Browsing this Thread
There are currently 18 users browsing this thread. (0 members and 18 guests)
Similar Threads
-
traveling steady, turning 1/2 bar down over 10".
By graffian in forum Metalwork DiscussionReplies: 3Last Post: 08-05-2013, 07:59 PM -
NEW MEMBER: Hello all, finally ready to start a build log.
By Iwant1 in forum New Member IntroductionsReplies: 11Last Post: 25-12-2012, 06:03 PM -
eBay: Boxford 125 TCL Mach3 Ready
By rnr107 in forum Items On eBay UKReplies: 1Last Post: 25-07-2012, 07:29 AM -
Anyone have experience of ready made machines
By bogstandard in forum Milling Machines, Builds & ConversionsReplies: 9Last Post: 07-04-2010, 07:44 PM -
Windows 7 RTM Confirmed & Ready !
By Lee Roberts in forum Computer SoftwareReplies: 8Last Post: 29-07-2009, 03:33 PM



Reply With Quote
Bookmarks