Thread: Quite an Unusual one
Hybrid View
-
08-12-2018 #1
Sorry to pick up that very old thread. But as I am new can't write messages. Could you explain how you did the dam beside the rails. You welded it on. But how did you make sure it's properly sealed so no Epoxy went under it. For the bridge I understood you took a channel from Knauf.
I was considering to upgrade my CNC with epoxy where I drilled the holes already. To prevent the epoxy to float in the holes. I see two options do it as you did and fill all holes with silicone. Or weld a channel over all holes.
Thanks a lot
Felix.
Sent from my MI 6X using Tapatalk
-
08-12-2018 #2
A good way to seal the leaks around a dam before you pour your epoxy is to make up a very small amount of the epoxy and using a small brush or similar just go round the inside of the dam brushing the epoxy into place. it will run into the holes or bridge the smaller holes but because there is not a large quantity behind it, will not run right through and leak out the bottom. You only need to leave it long enough to stop flowing easily before you pour the main epoxy batch - you do not need to leave it for days to fully harden. I made my dam from gaffer tape, stuck to the sides of the rails so that the edge of the tape was above the rails. Biggest problem was peeling it away from the epoxy when the epoxy had hardened. Next time I shall try pulling it away before the epoxy has fully hardened!
I had to strip my first load of epoxy off the rails and start again, but I had already drilled the rails. I put small pieces of Sellotape over the holes and poured the epoxy over the top. I could see where the holes were and then just drilled through the epoxy after it had set. Worked for me!
-
The Following User Says Thank You to Neale For This Useful Post:
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Bookmarks