Quote Originally Posted by Boyan Silyavski View Post
Hi there,
Long time no update. Long story short. Bought new epoxy and did it as I thought it would be right. It worked perfectly. As supposed the long rails sucked from the bridge. I went even further and made only 1 bridge. Yeah, the epoxy leveled without problems. I knew it.
This time I used Knauf channel 0.5mm 3m - 3€ from construction material site. Every attempt I am getting better for cheaper.
Also used 8 mm square bar around the epoxy. The channel was 4 mm wide so the bearings not to hit the bar

some photos. Will upload here also but now I am writing from my phone
https://plus.google.com/app/basic/ph...i%26pgpnum%3D1


Ps. Here are the photos:



















Sorry to pick up that very old thread. But as I am new can't write messages. Could you explain how you did the dam beside the rails. You welded it on. But how did you make sure it's properly sealed so no Epoxy went under it. For the bridge I understood you took a channel from Knauf.

I was considering to upgrade my CNC with epoxy where I drilled the holes already. To prevent the epoxy to float in the holes. I see two options do it as you did and fill all holes with silicone. Or weld a channel over all holes.
Thanks a lot
Felix.

Sent from my MI 6X using Tapatalk