Thread: Quite an Unusual one
Threaded View
-
15-10-2014 #11
That could be the proper way, though not understanding the process entirely, i prefer to make it like variant 3 of mine, so the rails finish in a wider bridges. It seems the thinner the bridge the faster it cures even if logic says otherwise, cause all say more epoxy at one place cures faster.
I was having in mind something like this. As i said my worry here is that i must shut off totally the flow and remove the bridge at the moment, so any leak here will be a disaster. cause what if i shut the bridges off and leave them in place. If they harden earlier, they will pull the shut off plate toward them. So the story repeats or the plate have to be very thick. I will think again about that.
I think of adding gates and provisionally tack soldering steel profile for the bridge this time.
Before a week i was going to argue with you but now not. Until figure the proper way to do it.
5 bridges...that's a lot of epoxy. I would do it in a blink if i though the problem is there. And that the result would be as desired. The problem seems the length of the bridge. Say a good epoxy shrinks 0.1% on length. 0.1% from 1700mm =1.7mm so if you take 1.7mm from area of 200mm long this is exactly the missing 0.15mm epoxy
Do you remember depth and width of channels and bridges, especially length of the bridges and if all checked well against straight edge?
Vertical walls. Same depth, i was very cautious after the first attempt. I agree that narrow bridges will suck less. I am almost sold on my variant 3 from the previous post, where the rails will suck from the bridges.
Considering all this, the very small gap and the time and effort, i just broke everything so will prepare for another pour
You could pour according to me 3mm minimum. So yes, could be done 2 times, risking other stuff like not good enough spread and leveling due to specific gravity. further complicating things with the wait times. imagine if they each shrink in different way, due to temperature or humidity difference that day.
Both rails must be plain in the same plane. If they are equal in all other but one is higher than the other, no problem, that difference could be fixed with the gantry rails, but then you will have only one rail as a starting point for squareness . So yes, its much better all to be flat. So you have to deal with left right and squareness between the 2 rails when mounting. Cause there are 6 directions to move and fix, so avoiding 2 of them , makes things simpler.
And yes, i insist in this level to be as perfect as possible, cause in the future the plan is to surface other smaller machines inside, gantries and so. By fixing alu plates and then surfacing them. That will save each build 200 or more $$, so yes , its important. Not to speak for a long aluminum mold or so the $$$ i will make or miss, so i broke the epoxy and will do it again. Its pain in the a** but irrelevant to the money i have spent till now.Last edited by Boyan Silyavski; 15-10-2014 at 03:57 PM.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Bookmarks