. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. Nice work Boyan, figured you must have epoxied both axis. Time consuming buisness but must be satisfying to get it that precise!

  2. #2
    At the end i managed to move further the build. Thanks to my new friend and fellow forum member Jeff Potter who helped me a lot with machining all aluminum pieces for me.

    Now what happened:

    -i bought some sound insulating stuff so i can make the garage quiet, so nobody bothers me in the future when i am working. I mean the tourists that come now in the summer and rent the houses around me



    -tested this and that and at the end finished the prototype of the fog-less mister and tested it while milling the aluminum pieces for the Z



    -tapped and started putting the Z box together , 5mm tap stem fits perfectly in the 6mm drill guide





    -The rails were meant not to obstruct the back plate. the idea was to use the back plate as a guide to mount them perfectly flat and square





    -mistake in the design. How the hell i was going to screw the ball screw nut supports. So i decided to cut a slot and at the end they will be screwed with 3 screws only.



    -as everything was machined very precisely and as i helped Jeff make his machine work in 3D mode, all fit perfectly together


    -the idea of the shortest front plate is if i lift and hide the spindle to its highest possible position inside the box, so i could reach and change tools without problems



    -the Z looks like a bad ass missile warhead

    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	20150307_205420.jpg 
Views:	2507 
Size:	240.8 KB 
ID:	15054   Click image for larger version. 

Name:	20150326_183236.jpg 
Views:	2533 
Size:	138.4 KB 
ID:	15055   Click image for larger version. 

Name:	20150326_193208.jpg 
Views:	2584 
Size:	252.4 KB 
ID:	15056   Click image for larger version. 

Name:	20150326_193256.jpg 
Views:	2507 
Size:	138.9 KB 
ID:	15057   Click image for larger version. 

Name:	20150327_131751.jpg 
Views:	2461 
Size:	276.2 KB 
ID:	15058   Click image for larger version. 

Name:	20150327_132227.jpg 
Views:	2554 
Size:	249.8 KB 
ID:	15059   Click image for larger version. 

Name:	20150327_132241.jpg 
Views:	2600 
Size:	248.2 KB 
ID:	15060   Click image for larger version. 

Name:	20150327_133756.jpg 
Views:	2510 
Size:	248.5 KB 
ID:	15061   Click image for larger version. 

Name:	20150327_134413.jpg 
Views:	2504 
Size:	86.0 KB 
ID:	15062   Click image for larger version. 

Name:	20150327_134425.jpg 
Views:	2509 
Size:	123.5 KB 
ID:	15063  

    Click image for larger version. 

Name:	20150327_140010.jpg 
Views:	377 
Size:	247.0 KB 
ID:	15064  
    project 1 , 2, Dust Shoe ...

  3. #3
    Some more. I hope you like detailed photos of builds. /there is 10 image limit and i like taking photos :-)/

    -The rotating ball nuts were press fitted and all worked fine. Though i have to change small things in the design, things that made me think a lot how to mount all of it together. And how it will be dismounted in near future if i decide to repair the belt...

    By the way i decided to start making together with Jeff and selling the assembly in the near future, for forum members and other. Redesign it a bit for any specific case and machine it properly. It is a result of the fact that i spend too much time fiddling with that assembly and investigating. And trying to find who will do it for me, and worrying if they did it properly and repairing their mistakes...
    So i would announce it at its proper place in the forum, hence will stop to brag here.



    -tadaaaa, second mistake. The 30t pulley is too much in front so hits the Z back plate




    -mistake repaired easily, thanks god



    - dry test looking for mistakes



    -ready to "surface" straight the side plates



    -i knew the sound proofing of the garage will pay off. why this always happens at lunch time when all normal people rest. had to take the bigger "surface" hammer and "surface" the plates for about half an hour



    -that's better



    -another dry test and squaring together
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	20150327_140010.jpg 
Views:	2528 
Size:	247.0 KB 
ID:	15065   Click image for larger version. 

Name:	20150327_140304.jpg 
Views:	2596 
Size:	211.1 KB 
ID:	15066   Click image for larger version. 

Name:	20150327_140256.jpg 
Views:	2413 
Size:	248.7 KB 
ID:	15067   Click image for larger version. 

Name:	20150327_141201.jpg 
Views:	2457 
Size:	276.3 KB 
ID:	15068   Click image for larger version. 

Name:	20150327_145824.jpg 
Views:	2484 
Size:	417.0 KB 
ID:	15069   Click image for larger version. 

Name:	20150327_150621.jpg 
Views:	2471 
Size:	346.6 KB 
ID:	15070   Click image for larger version. 

Name:	20150327_151113.jpg 
Views:	2459 
Size:	218.7 KB 
ID:	15071   Click image for larger version. 

Name:	20150327_153206.jpg 
Views:	2464 
Size:	236.0 KB 
ID:	15072  
    project 1 , 2, Dust Shoe ...

  4. #4
    Wow, 3 posts, it seems i had a lot to show and say

    -the Z again, 2 spot welds to hold the side plates in place



    -thats why i did not bother before too much rectifying the back Z plate. No i pushed it flat to the whole straight assembly, so all fell in place. Then spot welded CAREFULLY



    -I know Dean, OTT and too much but that cost me only 30euros more. I promise never to do that again.



    -squaring the Z in both directions against the straight edge that lies flat on long rails. this took a couple of hours to do it properly until satisfied



    -another consequence of the mistake i made here





    - That must be the most bad ass DIY Z axis i have seen on single gantry machine , OTT but make me proud and smiling when i look at it, so i assume it was worth it , did i say it looks like a missile ready to launch ?


    See that big, no - huge mill vice? Thats a gift from Jeff for the build. have to rethink this and that for the bed. I never imagined i will have some day such a beauty. On other hand its not fair some people to have 3 of them

    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	20150327_204040.jpg 
Views:	2467 
Size:	252.9 KB 
ID:	15073   Click image for larger version. 

Name:	20150327_205850.jpg 
Views:	2489 
Size:	240.6 KB 
ID:	15074   Click image for larger version. 

Name:	20150330_171600.jpg 
Views:	2505 
Size:	179.8 KB 
ID:	15075   Click image for larger version. 

Name:	20150330_190019.jpg 
Views:	2493 
Size:	207.3 KB 
ID:	15076   Click image for larger version. 

Name:	20150401_135808.jpg 
Views:	2603 
Size:	198.7 KB 
ID:	15077   Click image for larger version. 

Name:	20150401_154714.jpg 
Views:	383 
Size:	163.7 KB 
ID:	15078   Click image for larger version. 

Name:	20150401_154654.jpg 
Views:	2625 
Size:	212.4 KB 
ID:	15079  
    Last edited by Boyan Silyavski; 01-04-2015 at 03:53 PM.
    project 1 , 2, Dust Shoe ...

  5. #5
    Well done sylyavski! That Z looks VERY strong, I like it a lot.

  6. #6
    EPIC.
    You sir are raising the bar for all of us :)

  7. #7
    Don't get the point of 2 ballscrews on Z axis Boyan but it sure looks Cool.!. . . Mega OTT but very Cool.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •