. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #27
    I bought M25 or so bolts for the machine, soldered the nuts to the legs, thinking that will hold. When the machine was ready i left it on the nuts only and they lay on the hockey pucks. cause i did not find M25 bolts sturdy enough. On your machine M25 6cm bolt on the legs will shake like a plastic, once that heavy gantry starts accelerating.

    The pucks are made from hard PU rubber. make sure they are the solid ones, not refilled with something.


    You call 1cm imperfection , i have to deal with 6-7 cm inclination in my garage and i plan to level it with cement. Thats what is best to do, to level the floor under the machine. If i had to deal with 1cm, i would simply stick 10mm steel plate below the leg.


    Translate for you design:
    I meant these pieces in blue Not to be welded until the gantry is ready and mounted and rectified in all directions:
    Click image for larger version. 

Name:	AutoSave_cnc 100x100x3 profile x400y1000z200.jpg 
Views:	1244 
Size:	293.8 KB 
ID:	12974


    Then bolt these 2 together with a piece of paper between them/that for the later paint thickness
    Click image for larger version. 

Name:	AutoSave_cnc 100x100x3 profile x400y1000z200 2.jpg 
Views:	1107 
Size:	293.0 KB 
ID:	12975


    Then bolt all that is in blue together as it would be at the end, trying all bolts to be in the center of the holes. the bolts must not be tightened very much
    Click image for larger version. 

Name:	AutoSave_cnc 100x100x3 profile x400y1000z200 3.jpg 
Views:	1098 
Size:	292.8 KB 
ID:	12976


    Now move to one end the gantry and spot weld with 5- 6 spots 1 of the pieces in blue from the first picture. Rotate by hand the screw and move to other end of machine. Now you spot weld the other fixture.

    then dismount all in blue, ballscrews , etc. Then weld well the 2 fixtures. No everything is in parallel/guide rails and ball screws/ and perpendicular/ball screw supports.

    When painted and ready, mount them the same way. So the only necessary adjustment will me made by the play of the bolts that hold the ball screw end supports to the fixtures. Tighten them when gantry is at that end.

    In other words, now all 2 rails and 2 ballscrews are exactly parallel and have exactly same travel. Doesn't matter if one is up or down, otherwise using other method that also should be taken care of.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	AutoSave_cnc 100x100x3 profile x400y1000z200.jpg 
Views:	951 
Size:	291.5 KB 
ID:	12973  

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: New build.Stell frame cnc 1500X1000.Ball screw and gearing calculations
    By ba99297 in forum DIY Router Build Logs
    Replies: 12
    Last Post: 03-09-2013, 10:37 PM
  2. Adjustable spindle mount?
    By cncJim in forum Marketplace Discussion
    Replies: 2
    Last Post: 19-06-2013, 08:58 PM
  3. Your Opinion
    By PWD in forum Milling Machines, Builds & Conversions
    Replies: 4
    Last Post: 22-05-2012, 11:02 AM
  4. Opinion about the structure of the router ...
    By C.AlveSilva in forum Gantry/Router Machines & Building
    Replies: 11
    Last Post: 01-05-2012, 02:03 PM
  5. WANTED: adjustable tailstock
    By johngoodrich in forum Items Wanted
    Replies: 0
    Last Post: 29-03-2012, 07:38 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •