Hi

Can i tease a few more questions. I get you now, you only need high production of tennon and mortace cutting, Idealy feeding a number to the machine at the same time ( example 10 lenghts or more ). The cut has to always be 45deg,

Some assumption first

The lengths of the material does not need to be understood by the machine because your only cutting one end at a time.

Depth and width.

Width ( examples. 80mm ,120mm 200mm 250mm ). Again depending on your machine design, you could possibly ignore width, if you design you machine so the cutter is always comming down at 45d to the material. It will not matter to the machine how wide your material is.

depth. ( example 20mm 30mm 40mm ). The depth, is important, so you get the correct spacings for you tenon and mortice. and either the tooling or the movement of the machine needs to be able to deal with the accurately.

Questions.

1. Is one pass usually enough or do you have any final finishing
2. Will you have an operator at the machine when the cuts are being done.
3. on a very busy day, how many individual tenons. ( highest level of production you need )

Them three questions should give everyone a clearer idea